Construction of Vaduthala railway overbridge, Perandoor-Vaduthala bridge to begin on October 7

Direct Source Verification: This story is aggregated from The Hindu (thehindu.com). Full reporting rights and copyright belong to the primary publisher.
The new bridge, which is being constructed across the Perandoor Canal and will connect Vaduthala and Perandoor, will serve as a key transport link and enable people to travel quickly from Container Road via Vaduthala to Kaloor, thereby bypassing the congested National Highway

You don’t have any Active Subscription.

Account subscription benefits alongside Premium Stories, Editorials, Opinions and more. Unlock these with Subscription

The inauguration of the construction of the Vaduthala railway overbridge and the Perandoor-Vaduthala bridge will be held on October 7. Public Works Minister P.K. Basheer will inaugurate the construction. The projects are expected to alleviate traffic congestion in Ernakulam city, according to a statement.

The new bridge, which is being constructed across the Perandoor Canal and will connect Vaduthala and Perandoor, will serve as a key transport link and enable people to travel quickly from Container Road via Vaduthala to Kaloor, thereby bypassing the congested National Highway.

An administrative sanction of ₹34.24 crore has been granted for the project. As per the revised alignment, around 34 cents of land in the Perandoor area and 55 cents in the Vaduthala area have been acquired. The proposed bridge will have a total length of 153.6 metres and an overall width of 11 metres.

It will feature a 7.5-metre-wide carriageway flanked by 1.5-metre-wide footpaths on both sides. The project completion period is two years.

In the case of the Vaduthala railway overbridge, which is being constructed at railway level crossing number 69 in the Ernakulam constituency, a financial sanction of ₹91.89 crore has been obtained. The total length of the flyover is 372.78 metres. The bridge will have a total width of 10.15 metres and comprise a 7.5-metre-wide carriageway and a 1.50-metre-wide footpath on one side.

The project is also expected to help reduce the risk of accidents. Once the Vaduthala railway overbridge and the Perandoor-Vaduthala bridge become a reality, connectivity between Vaduthala, Perandoor, Pachalam, Chittoor and surrounding areas will be strengthened, according to the communication.

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.

Original Source
https://www.thehindu.com/news/national/kerala/construction-of-vaduthala-railway-overbridge-perandoor-vaduthala-bridge-to-begin-on-october-7/article71548280.ece
Visit The Hindu ↗
SHARE STORY:
𝕏 f in

Related Coverage in Business