Gridlock paralyses Lagos-Ibadan expressway, commuters stranded for hours - Punch Newspapers

Direct Source Verification: This story is aggregated from The Punch Nigeria (punchng.com). Full reporting rights and copyright belong to the primary publisher.
A photo showing heavy traffic on Lagos-Ibadan Expressway. Credit: Daniel Ayantoye.

A photo showing heavy traffic on Lagos-Ibadan Expressway. Credit: Daniel Ayantoye.

Motorists and commuters were stranded for several hours on Wednesday as the resumption of construction work on a pedestrian bridge at the Aseese area of the Lagos-Ibadan Expressway triggered a massive traffic gridlock.

PUNCH Metro correspondents monitoring the situation gathered that the traffic stretched from the Redemption Camp area to Aseese bus stop for motorists heading towards Lagos, while those travelling from Lagos towards Ogun State were held up from the Long Bridge area to Aseese.

One of our correspondents, who boarded a commercial vehicle from Ibadan shortly after 11 am, did not arrive in the Magboro area of Ogun State until about 5.30 pm.

Another motorist lamented spending eight hours travelling from Mowe to Magboro.

The situation was still the same as of 10 pm, with both ends of the road totally blocked.

The situation was further compounded by motorists who drove against the traffic to beat the gridlock.

They ended up blocking those who were in the right lane.

Commercial motorcyclists made brisk business conveying people.

One of our correspondents paid N2,000 for a trip from PUNCH Bridge to Lotto Bus Stop.

In September 2026, The PUNCH reported that motorists and commuters on the expressway were trapped in gridlock for over 14 hours after a multiple-vehicle crash at the Kara Bridge compounded ongoing repair works on the bridge.

The crash, which occurred in the early hours of the day, involved seven vehicles and initially disrupted movement towards Ogun State, with the resulting gridlock later stretching beyond the Long Bridge towards Magboro and into Lagos.

As congestion worsened, some impatient motorists drove against traffic to escape the gridlock, creating another bottleneck for vehicles heading towards Lagos.

The incident occurred amid ongoing repair works on the Kara Bridge, which have already caused significant disruption on the Lagos-Ibadan Expressway.

PUNCH Metro had reported that motorists faced hours of delays after repairs began on damaged expansion joints on the Kara Bridge, with congestion stretching from the bridge towards the 7Up Junction and other parts of the Lagos-bound carriageway.

The repair works have reduced the available road space around the bridge, making the corridor particularly vulnerable to severe congestion whenever crashes, broken-down vehicles or other obstructions occur.

All rights reserved. This material, and other digital content on this website, may not be reproduced, published, broadcast, rewritten or redistributed in whole or in part without prior express written permission from PUNCH.

Stay informed and ahead of the curve! Follow The Punch Newspaper on WhatsApp for real-time updates, breaking news, and exclusive content. Don't miss a headline – join now!

Stay in the knowβ€”fast. Get instant alerts, breaking headlines, and exclusive stories with the Punch News App. Download now and never miss a beat.

Original Source
https://punchng.com/gridlock-paralyses-lagos-ibadan-expressway-commuters-stranded-for-hours/?amp
Visit The Punch Nigeria β†—
SHARE STORY:
𝕏 f in

Related Coverage in Breaking News