Mindanao grid on yellow alert on Saturday, Sept. 12, 2026 - GMA Network

Direct Source Verification: This story is aggregated from GMA News Online (gmanetwork.com). Full reporting rights and copyright belong to the primary publisher.
The Mindanao grid will be placed under yellow alert on Saturday, September 12, 2026, the National Grid Corporation of the Philippine said.

The Mindanao grid will be placed under yellow alert on Saturday, September 12, 2026, the National Grid Corporation of the Philippine said.

In an advisory, the NGCP said the yellow alert will be in effect from 5 to 7 p.m.

The grid's available capacity is 2,623 MW but expected peak demand is 2,456 MW, the company said.

These have resulted in a total of 740.7 MW unavailable to the grid.

The NGCP also said Mindanao's large coal plants GNPK 2 and 3 are unavailable, which contributed to the declaration of a yellow alert.

"A yellow alert is issued when the operating margin is insufficient to meet the transmission grid’s contingency requirement," the NGCP said. —KG, GMA News

Original Source
https://www.gmanetwork.com/news/topstories/regions/1002115/mindanao-grid-on-yellow-alert-on-saturday-sept-12-2026/story/
Visit GMA News Online ↗
SHARE STORY:
𝕏 f in

Related Coverage in Business