Union Cabinet approves new railway lines at a cost of ₹9,889 crore in Andhra Pradesh

Direct Source Verification: This story is aggregated from The Hindu (thehindu.com). Full reporting rights and copyright belong to the primary publisher.
The 198-km-long third and fourth lines between Rajahmundry and Visakhapatnam is expected to improve connectivity to major ports, boost access to tourist destinations, and lead to an additional freight traffic of 29.04 million tonnes per annum

You don’t have any Active Subscription.

Account subscription benefits alongside Premium Stories, Editorials, Opinions and more. Unlock these with Subscription

A map showing the new railway lines sanctioned by the Union Cabinet.

The Union Cabinet approved the laying of the third and fourth railway lines between Rajahmundry (Nidadavolu) and Visakhapatnam (Duvvada) at an estimated cost of ₹9,889 crore on Saturday, aiming to ease congestion on one of the country’s busiest rail corridors.

The 198-km-long route, which is a part of the quadrupling initiative of the Howrah–Chennai High Density Network (HDN) route, will involve a total track length of 458 km.

The corridor currently operates at nearly 130% capacity, leading to frequent delays, and is expected to face further pressure due to expanding port and industrial activity along the East Coast.

The new alignment, passing through East Godavari, Konaseema, Kakinada, Anakapalle and Visakhapatnam districts, will include a 4.3-km rail bridge over the Godavari, a 2.67-km viaduct, and three bypasses. The new alignment will also be around 8-km shorter than the existing route, improving operational efficiency.

The project will enhance connectivity to major ports such as Visakhapatnam, Gangavaram, Machilipatnam and Kakinada, while also boosting access to tourist destinations such as Annavaram, Antarvedi and Draksharamam.

Officials estimate an additional freight traffic of 29.04 million tonnes per annum consisting of coal, cement, chemical manufacturers, iron and steel, food grains, containers, bauxite, gypsum, limestone and others, and annual logistics savings of ₹1,150 crore vis-a-vis road transportation.

The project is expected to generate 135 lakh human-days of employment and significantly cut carbon emissions, supporting sustainable and economic growth in the region.

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.

Original Source
https://www.thehindu.com/news/national/andhra-pradesh/union-cabinet-approves-new-railway-lines-at-a-cost-of-9889-crore-in-andhra-pradesh/article70877644.ece
Visit The Hindu ↗
SHARE STORY:
𝕏 f in

Related Coverage in Business